To make the methods of construction of a clay pot in a shower or bath tiles can remake the mistakes of installation is complete.
Broken shower kitchen can lead to breakage, loss and a global catastrophe.
Follow these steps to place the clay pot and be sure to read again and again, because the whole article for all materials necessary for the project and make the initial effort.
1. The complete demolition of shower area floor and wall.
Remove allDebris, and leave the area in broom clean.
2. Create a vapor barrier to protect against rot and decay.
Roofs Staple estimated 15 pounds on the wall and the substrate. Overlap seams, if necessary.
3. Building the sidewalk.
You can also nailed in the shower to limit the use of 2×4 wood. And 'the industry standard for a six-inch curb, so three 2×4 properly stacked. We recommend using stainless steel nails to attach together.
AlsoSubstitute for a 2×4 chassis with a sidewalk prefabricated pavement.
4. The construction of a vessel off the track.
Used the mixture of clay for the completion of the project is 1 part Type II Portland cement to 4 parts clean moist sand. Ensure that the mixture of sufficient stock to complete the project in general. (I do not know comes up and then a cold "in response to treatment" hot ").
Building on a pre-slope to direct water flow. Try to keep the outer edge, and remember that your last climb 1 / 4 increase for allFoot.
5. The installation of the waterproof coating.
They have a waterproof coating, the cleats on your brakes in good shape and buy bread and wrap tightly in the wall to grow at least 3 "above reduced by three walls.
Connect a line or go anywhere, but in curves and amounts to an increase in the wall. (Staples or nails)
Make an "X" on the cut line on the wing and into things.
6. Install prefabricated concrete on the wall.
The installation of 1 / 2 "pieces of precast concreteNail in the wall. Approved the use of attachment, see the instructions on the label backerboard.
Trowel seams with 2 "tape and thinset fiber optic network.
Be sure to penetrate waterproof liner and stay at least 6 "above bottom of backerboard where in the shower.
7. Pallet mud shower pan.
Use mud mix (1 part Type II Portland cement to create pan to 4 parts clean moist sand) to take a shower.
Keeping in perimeter and facility spatula, an increase of 1 / 4 "All feet. To preclude Pack about an inch of mud over the entire stop.
Use a flat spatula to contain the mud pan and smooth the whole. Maturing leaves for at least 24 hours
8. Pictures of Seth.
The laying of tiles for the PAN and the walls with adequate Malta September subtle.
Good luck!
And fun.
0